kizza and loki's te/tg ute project
Re: kizza and loki's te/tg ute project
Finished plumbing up the clutch using the rodeo flexi line and shortened hard line.
Also tested out the thermo wiring.
So other than a couple of brake lines the driveline is basically sorted.
Also tested out the thermo wiring.
So other than a couple of brake lines the driveline is basically sorted.
Re: kizza and loki's te/tg ute project
Now its driving i decided i can justify putting tyres on the rims.
Re: kizza and loki's te/tg ute project
Modifying the fuel tank and back to meet compliance. Should end up with about 75ltrs.
- Jonno
- Korean Jesus
- Posts: 2370
- Joined: Tue Jul 25, 2006 5:28 pm
- Location: Canberra. Where the Fast Geminis live
- Contact:
Re: kizza and loki's te/tg ute project
Drop tank?
75 TX Coupe
GemiNats > https://www.facebook.com/GeminiNationals
#TurboFamily #Geminats #Bucketship
YT: https://www.youtube.com/channel/UCPKSHb ... akJ04sOYjw
GemiNats > https://www.facebook.com/GeminiNationals
#TurboFamily #Geminats #Bucketship
YT: https://www.youtube.com/channel/UCPKSHb ... akJ04sOYjw
Re: kizza and loki's te/tg ute project
Yeah. I had it in my old wagon but it wasnt compliant. Need to have a skid plates or bash plate if lower than 200mm. And cannot protrude below departure angle. Going from about 45 litres to nearly 80.
Re: kizza and loki's te/tg ute project
You've been a busy boy. Whats the story with engineering, still mod plate in QLD or a bit more in-depth now?
Previously GeminiCoupe/GeminiRollingShell/SCAR3D/Jonnoisac#nt
78 TD Gemini Sedan - R.I.P
81 TE Gemini Sedan
78 TD Gemini Sedan - R.I.P
81 TE Gemini Sedan
Re: kizza and loki's te/tg ute project
Just finished modifying the shifter with a threaded sleave so it fits over the boot. Hopefully tomorrow my mate will help finish of the fuel tank.
I believe its still lh7 mod plate. Plus brakes, fuel tank ect
I believe its still lh7 mod plate. Plus brakes, fuel tank ect
Re: kizza and loki's te/tg ute project
Shifter done. Fuel tank 80% done. I also sent the dash off to be restored this week im expecting it back early feb.
- LOK15
- Gemini Master
- Posts: 5452
- Joined: Thu May 19, 2005 3:30 pm
- Location: lok.lives@bundamba. ipswich.qld.au.earth
Re: kizza and loki's te/tg ute project
I guess then it'll be almost my time to take it off your hands and finish the body?
Getting too old for this s*#t!!
Re: kizza and loki's te/tg ute project
Yes and no. I wanna get the brakes plumbed up and get the exhaust done. I still have to finish tank mounts and route fuel pump/reg ect. But fingers crossed it will be ready early/ mid next year. Still so much small stuff to do.
- LOK15
- Gemini Master
- Posts: 5452
- Joined: Thu May 19, 2005 3:30 pm
- Location: lok.lives@bundamba. ipswich.qld.au.earth
Re: kizza and loki's te/tg ute project
yeah, thats fine. having it drivable will definitely make it easier. I have a new guy who can do the mod plate as the other guy has retired.
Getting too old for this s*#t!!
- Jonno
- Korean Jesus
- Posts: 2370
- Joined: Tue Jul 25, 2006 5:28 pm
- Location: Canberra. Where the Fast Geminis live
- Contact:
Re: kizza and loki's te/tg ute project
LEave the body as is. Rate you're going you should get it together for Geminats
75 TX Coupe
GemiNats > https://www.facebook.com/GeminiNationals
#TurboFamily #Geminats #Bucketship
YT: https://www.youtube.com/channel/UCPKSHb ... akJ04sOYjw
GemiNats > https://www.facebook.com/GeminiNationals
#TurboFamily #Geminats #Bucketship
YT: https://www.youtube.com/channel/UCPKSHb ... akJ04sOYjw
Re: kizza and loki's te/tg ute project
It currently drives but only the handbrake works. Just have to plumb the lines into the diesel remote master cyl. I may even swap it out for a 1inch isuzu master while im at it.
As for geminats id be lucky to make 2019 at this rate. Theres still so many details to be finnished. I wosh o could get it sorted by next year but its hard working 6 days and having 2 little ones that arnt quite big enough to be unsupervised in the shed.
As for geminats id be lucky to make 2019 at this rate. Theres still so many details to be finnished. I wosh o could get it sorted by next year but its hard working 6 days and having 2 little ones that arnt quite big enough to be unsupervised in the shed.
Re: kizza and loki's te/tg ute project
Today i did a little more work on the tray area. I cut out the bracing i had put in years ago. I still have to finnish the framework underneath but i have made a single centre hatch and reinforced all 3 sections.
I also mounted the fuel pressure reg and gauge. Still a little bit to do on the droptank.
I also mounted the fuel pressure reg and gauge. Still a little bit to do on the droptank.
Re: kizza and loki's te/tg ute project
Tanks in. Fuel in and out sorted just need to setup the breather lines and filler neck, fuel pump wiring, fuel sender wiring, mount fuel pump. Make side panels, hinge and secure battery hatch, secure battery ect
Still so much to do.
Still so much to do.